I'm trying to convert an AVI to MPEG with TMPGEnc, following a guide here on AfterDawn. I follow all the instructions in the guide, but when it comes time to convert, and i get to the screen that says "make file size (blank) % of disc space, it won't go any lower than 115.30%. I need it to be at the most 97% because I need to leave room for the subtitles. So then I look up and I see that under movie info it says that the movie is 279 minutes 01 seconds. This is incorrect. I've watched the movie on my computer and I double checked to make sure and it's only an hour and half long. Can somebody please help me? Thnx.
Try this. Click setting and click the advanced tab. Select Source Range from the list and if it doesnt pop up, double click source range. Click "move to start frame" and click "set start frame" then click "move to end frame" and click "set end frame". Then click OK and try again! From here:http://forums.afterdawn.com/thread_view.cfm/40101