Hi, after sucessfully installing the UnleashX Dashboard with the help of the SID 2.0 I have about 15 different choices in my XBOX Main menu. The first on is Restore MS Backup and somewhere at the very bottom it says launch dvd. I want to know whether there is the possibility of rearranging the Menu Points, so that I don't have to Scroll all the Way down just to Start a Game. I hope you can help me, Thx A Lot, Jochen
mine is at the very top,you should be able to change that in the .xml file which should be in the same directory of the unleash.xbe